Commissioning

Commissioning is the quality assurance method for new construction. For best results, the commissioning process should begin early in the design phase and continue throughout construction, ensuring more seamless occupancy.

ACS specializes in healthcare, data center, mission critical, higher education, and laboratory MEP commissioning.

ACS can also help by providing assurance with specialty systems like elevators, CCTV, Fire Systems, and nurse call.

Retro-Commissioning

Existing buildings can also benefit from the commissioning process. Seeking to correct issues that occurred during design or construction, as well as address normal wear and tear of systems, retro-commissioning places existing buildings into a more energy efficient state.

Retro-commissioning empowers owners with a better understanding of the building sequences and problems, optimizing the project to best suit the needs of the owner.

Re-Commissioning

ACS provides this service to backcheck a project that has already been completed and is having issues or is untrustworthy. This process might be done to understand a building from a new owner or might be done to understand some operational problems.

MEP/FLS Assessments

ACS can provide assessments to give owners more details of how their building is operating. These assessments are utilized to understand the HVAC, Electric, Plumbing, and Fire/Life Safety systems that are in an existing building giving the owner a better idea of how their building is being maintained, and what issues might be seen in time.

Asset Tagging

ACS has provided methods of tracking physical assets of owner’s equipment. Through barcoded or branded labels, ACS can help simplify the needs for sustaining operations and maintenance on various types of owner’s property.

Why choose us?

Design Knowledge

Our commissioning team boasts licensed professional engineers with over 25 years collectively of MEP engineering design experience. This expertise allows ACS to provide unrivaled commissioning reviews of the project design before construction begins. The intensity and depth of these reviews improve the quality of the design, speed up construction and commissioning, and reduce cost and schedule impacts during the project.

Construction Flexibility

Construction schedules are dynamic and every project is unique. ACS is Adaptive in construction by collaborating with design teams, contractors, and facilities staff to ensure owner expectations are met while maintaining the project schedule. ACS has a unique background in Lean Construction practices that integrates commissioning with the construction team, unlike traditional processes. ACS supports and actively participates in pull planning and scheduling meetings with the project team to assist in successfully completing the project in a condensed timeframe.

Empowered Facility Staff

Successful operation and long-term maintenance of buildings comes through strong facilities personnel. Our team advocates for complete closeout of construction activities, owner training, and turning over a finished set of project closeout documents. ACS efforts integrate with the contractor’s training and project closeout documents. As the project nears completion, ACS works alongside the facility’s operators to ensure smooth turnover from construction to operation.

ACS Project Map

PHASE I

DESIGN

OPR & BOD REVIEW

COMMISSIONING (Cx) PLAN

DESIGN REVIEWS

Cx SPECIFICATIONS

PHASE II

CONSTRUCTION

MEETINGS

PRE-FUNCTIONAL CHECKLISTS

CONSTRUCTION REVIEWS

DAILY HUDDLE SUPPORT

FUNCTIONAL PERFORMANCE TESTS

ISSUE VERIFICATION

OWNER TRAINING

FINAL REPORT

PHASE III

OCCUPANCY

SEASONAL TESTING

10-MONTH REVIEW